Home
sp
Home
sp
Stick Built Garages
sp
Roofing
pole barns Roofing Gallery
sp
Home Improvements
sp
Testimonials
pole barns  

Tear-Off Roofing Job with Major Structural Repairs

Scott & Valerie Davis
Paw Paw, MI
July 2007

Craftsman Style Pole Barn

Job Specifications

  • Complete Shingle Tear-Off to roof decking disposed of into a roll-off dumpster
  • There was an 8" sag in the Ridge Line & belly in the roof above the skylights. from inside the attic space Jack Rafters & King Posts were run from the Ridge& Rafters to the Bearing Walls below to Raise & Straighten the Roof Permanently.
  • Ice & Water Shield was installed at the chimney, around the skylights, and 6' wide along the eve walls. The rest of the roof was covered with 30# roof felt.
  • The Roof was Shingled with Owens Corning 25yr Supreme 3&1 Shingles
  • The Skylights were Step Flashed and the Factory Curb reinstalled.

 

roofing

 

Before the Job

Notice the sag in the ridge line and the belly in the roof deck.

 

roofing

 

After the Job

The Roof Shingles, Felt, and Flashings have been torn off and are on Tarps ready to be picked up.